Prefabricated Compact Packaged Substation Outdoor Cabinet 11kv 500kva 1000kva 2000kva 2mva Compact Box Substation Power Supply

Prefabricated Compact Packaged Substation Outdoor Cabinet 11kv 500kva 1000kva 2000kva 2mva Compact Box Substation Power Supply

Short Description:

Prefabricated warehouse substations integrate functional modules into the prefabricated warehouse body, and the layout of equipment inside the warehouse is compact. It has fast construction, small footprint, high reliability, and is widely used in various power supply scenarios.

    Overview details 

    Prefabricated warehouse substations The primary and secondary prefabricated cabinets play a significant role in modern electrical power systems. Functionally, they are designed to integrate and house a variety of electrical equipment and components. For the primary side, it typically includes devices such as transformers, circuit breakers, and disconnectors that are crucial for the initial step of power transformation and distribution. These components in the prefabricated cabinet help in stepping up or down the voltage as per the requirements of the power grid, and safely disconnect or connect the power source when needed. On the secondary side, it contains equipment like measuring instruments, control relays, and communication devices. This allows for accurate monitoring and control of the power flow. The measuring instruments can measure parameters such as voltage, current, and power, providing valuable data for system operation and analysis. The control relays can be used to automate certain operations and respond to different electrical conditions, enhancing the reliability and efficiency of the power system. The prefabricated cabinets also offer several advantages. They are pre-assembled in a factory-controlled environment, ensuring high quality and consistency. This reduces on-site installation time and complexity. Moreover, their compact design and modular structure make them easy to transport and install, especially in areas where space is limited or access is difficult. Overall, the primary and secondary prefabricated cabinets are essential for the efficient and reliable operation of electrical power systems, from power generation to distribution and utilization.The difference between equipment prefabricated compartments and traditional substations

    Technical parameter

    Project

     

     

    Floor space

    About 3000 square meters

    About 2000 square meters

    Construction period

    About 3-4 months

    The whole station is pre-assembled as a whole, all the equipment is prefabricated by the factory, and can be installed on site. The construction period is short, 1-2 months

    Cable usage

    The device is distributed, and the amount of primary and secondary cables is large

    The equipment is highly integrated, the electrical distance is shortened, and the cable can be saved by about 30%

    Environmental requirement

    High environmental requirements, wind sand, condensation and other harsh environment areas are very harmful to equipment

    Adopts all-metal cabin design, IP54 protection grade, equipped with perfect HVAC system, can prevent sand, condensation, improve equipment reliability

    Construction and management costs

    There are many buildings, high construction costs, equipment provided by different manufacturers, and high coordination management costs

    Prefabricated design, cancellation of buildings in the whole station, low construction costs, all equipment provided by Changsong Electric, and responsible for all installation and commissioning work, low management costs

    Operation and maintenance cost

    Open design, affected by the environment, high operation and maintenance costs

    Closed design, basically not affected by external conditions such as the environment, low operation and maintenance costs


    description2

    FAQ

    • 1.What are our main products?

      Primary and secondary equipment prefabrication compartment, photovoltaic booster substation, photovoltaic grid-connected cabinet, parallel cage, PV combiner box, MCCB,MCB,The surge protector,tec.
    • 2. If I go to China, can I visit your factory?

    • 3.Can the product be used in harsh environments?