CS Distributed Photovoltaic Substation
Overview details
Technical parameter
|
Project |
||
|
Floor space |
About 3000 square meters |
About 2000 square meters |
|
Construction period |
About 3-4 months |
The whole station is pre-assembled as a whole, all the equipment is prefabricated by the factory, and can be installed on site. The construction period is short, 1-2 months |
|
Cable usage |
The device is distributed, and the amount of primary and secondary cables is large |
The equipment is highly integrated, the electrical distance is shortened, and the cable can be saved by about 30% |
|
Environmental requirement |
High environmental requirements, wind sand, condensation and other harsh environment areas are very harmful to equipment |
Adopts all-metal cabin design, IP54 protection grade, equipped with perfect HVAC system, can prevent sand, condensation, improve equipment reliability |
|
Construction and management costs |
There are many buildings, high construction costs, equipment provided by different manufacturers, and high coordination management costs |
Prefabricated design, cancellation of buildings in the whole station, low construction costs, all equipment provided by Changsong Electric, and responsible for all installation and commissioning work, low management costs |
|
Operation and maintenance cost |
Open design, affected by the environment, high operation and maintenance costs |
Closed design, basically not affected by external conditions such as the environment, low operation and maintenance costs |
description2
Product Photograph

FAQ
-
1.What are our main products?
Primary and secondary equipment prefabrication compartment, photovoltaic booster substation, photovoltaic grid-connected cabinet, parallel cage, PV combiner box, MCCB,MCB,The surge protector,tec. -
2. If I go to China, can I visit your factory?
-
3. Can the product be used in harsh environments?